Reduce Runs to the Hardware Store and Save Time and Money

Is everyone sitting around waiting because you ran out of nails? When employees leave the jobsite to pick up materials, you have a double loss with transport costs and time. Studies show that these costs can take up as much as 2-4% of the project’s profits for most small to medium construction companies. But with a better system and planning, you can vastly reduce lumberyard runs and improve your efficiency and your bottom line

Read The Full Post »

Lot Sizes Shrinking Nationwide

Lot sizes are always getting smaller. Over the last decade alone, the national average lot size for a new family home build has dropped by nearly 2,000 square feet from 10,500 square-feet in 2010 to 8,700 square feet in 2020. While lots have been getting smaller, homes have been getting bigger—growing from an average of …

Read The Full Post »